Medway Maritime Hospital

Refurbishment of Theatres

Gillingham
Value – Circa £1m
Client – Medway NHS Foundation Trust
Date – July 2019
Duration – 10 months

This project involved the complete refurbishment of 10 Operating Theatres in 2-phases. Each theatre was allocated a strict 6 day time frame.

The existing flooring was stripped out in the Main Theatre, Anesthetic Room, Scrub-in room and Store room – all of which were replaced with new vinyl laminate.

The walls were stripped down and painted with a stain-shield paint throughout. A hygienic wall cladding system was installed with thermo-formed edging and welded joints to meet with infection control requirements.

Full works included:

  • Decorating
  • Joinery
  • Flooring
  • Hygienic Wall Cladding
  • IPS Systems
Hospital Ward Refurbishment and Building Services